Incentives
Get paid for a pre-approved upgrade, retrofit, or new installation
Incentive Process
Incentive Rates
Strategic Energy Management (SEM)
Measurement Type
Incentive Cost Cap
SEM
$0.01/kWh*
$0.10/therm*
None
Milestone Incentives Available
Normalized Meter Energy Consumption (NMEC)
Measurement Type
Incentive Cost Cap
SEM
$0.02/kWh*
$0.20/therm*
None
Custom Measures
Measurement Type
Incentive Cost Cap
AR**, AOE**, NR***
$0.08/kWh*
$1.00/therm*
AR: 75% of ARC***
AOE: 75% of FMC***
NR: 100% IMC***
Deemed Measures
(If not otherwise specified)
Measurement Type
Incentive Cost Cap
AR**, AOE**, NR**
$0.05/kWh*
$1.00/therm*
75% of FMC***
* Base incentives for to-code custom projects are capped at 50% of those listed above.
**AR = Accelerated Replacement, AOE = Add on equipment, NR = Near Replacement
*** ARC = Accelerated Replacement Cost, FMC = Full Measure Cost,
IMC = Incremental Measure Cost